GM的8310文件(pdf 21页)
所属分类:经营管理
文件大小:1515 KB
下载要求:10 学币或VIP
点击下载Attachment B:
Introduction
The New Equipment Technical specifications are based on the PMP strategies identified
under Planned Maintenance and are designed to eliminate the “six big Losses” associated
with machine and equipment downtime:
! Equipment failure losses
! Setup and adjust losses
! Losses due to idling and minor stoppage
! Operating at reduced speeds
! Process defect losses
! Reduced yields due to poor quality
Machinery and equipment design shall allow for visual inspection of operating parameters,
with the inspection to be complete within a minute or less. The inspection to be conducted
must provide information about the equipment’s normal and/or abnormal operating status.
Machinery and equipment design shall allow correction of abnormalities for fine-tuning.
(I.e. adding lubrication or adjusting air pressure without removing guarding or shutting off
power, well at the same time complying GM Safety Standards.
New Machinery and Equipment Technical
Specifications (general applications)
1. Supplier shall follow the Production Maintenance Partnership Guidelines for new and
existing machinery and equipment. (See PMP Manual QN-2833)
2. Machinery and equipment shall include design-in features to facilitate quick inspection
and diagnostics to detect wear. (I.e. pressure gage outside the normal operating range)
3. Use of transparent windows, where feasible, to facilitate inspections.
(I.e. transparent/plastic guarding. (Refer to page )
4. Machine design shall display system functions visually. (See PMP Manual QN-2833)
5. Guarding should be designed for ease and timely removal and installation, while meeting
all GM Safety Requirements. (I.e.captive hardware, quick connect and disconnect
components) (See R&M Specification 1.0 GM-3800 for additional list)
6. Machinery and equipment inspection, by the operators, shall meet the requirements by
completing the inspection within a minute or less. The layout for inspection should
illustrate the optimum inspection locations as well as the items to inspect at each
location.
..............................
精品资料网 m.cnshu.cn
Copyright © 2004- 粤ICP备10098620号-1
风险管理 应急预案 研发管理 运营管理 内部管理 商业模式 执行力 连锁经营 公司治理 工厂管理 创新管理 家族企业 效率管理 名企案例 企业理念 价值管理 特许经营 瓶颈管理 调查问卷 策划方案 领导力 团队建设 企业变革 企业文化 战略管理 竞争策略 管理知识 危机管理 成本管理 项目管理 发展战略 年度计划 决策管理 企业上市 供应商 组织设计 产品管理 采购管理 品牌管理 企业诊断 企业咨询 商务谈判 物流管理 运作管理 管理制度 行业报告 经营管理 企划方案 MBA 流程管理 目标管理 招标投标 商务礼仪 管理表格 管理技能 管理案例 管理工具 管理手册 职业经理人 商业计划书 董事与股东 可行性报告