精品资料网 >> 品质管理 >> 质量认证 >> 资料信息

福特QS9000各种检查表(xls 12)

所属分类:质量认证

文件大小:117 KB

下载要求:10 学币或VIP

点击下载
资料简介:

Expectations    
1) A manufacturing responsible cross-functional team must be used to develop the production control plan.   
2) The pre-launch control plan must be prepared per section 6 of the Chrysler-Ford-General Motors   
 Advanced Product Quality Planning Manual and Control Plan Reference Manual.   
3) Special characteristics from the process and design FMEAs, the customer and other sources   
 must be clearly identified on the production control plan.   
4) Inspection plans must be definied for all material and engineering specifications.   
5) Flow chart operations and their desired product and process characteristic specifications must be   
 listed on the production control plan.   
6) Data must be developed to show the direct relationship between special characteristics and their   
 controlling process parameters.   
7) Gages and test equipment to be used during production must be identified on the   
 production control plan.   
8) Evidence must be available to show that gages and test equipment identified on the production   
 control plan are accurate, discriminant, repeatable and reproducible.   
9) The customer must be given the opportunity to approve the production control plan.   
10) Documented measurement procedures, techniques and datums must be referenced   
 on the production control plan.   
11) Reaction plans must specify the containment and corrective actions necessary to avoid producing   
 nonconforming products or operating out of control.   
12) Control methods must address the requirement to produce product characteristics within specification.   
13) Current controls listed in the process FMEA must be consistent with those listed on the production   
 control plan.   
14) Reaction plans must be written so the operator can understand and implement them.   
15) Statistical control methods must be documented on the production control plan.   
16) Control methods and reaction plans must be updated to address any issues and lessons learned   
 during the production trial run, including countermeasures for known capability problems.   
17) Appropriate sample sizes and frequencies must be documented on the production control plan.   

..............................

上一篇:ISO9000:2000质理管理体系要求(ppt 130)

下一篇:ISO9000:2000文件编写课程(ppt 27)

质量管理——质量计划指南(doc31)

物业管理质量体系ISO基础知识(doc 51页)

ISO-IEC17025(英文版)(PDF 28)

ISO9000的认证与无损检测的质量管理(ppt 35页)

ISO9001标准宣贯手册(doc 23)

ISO14001:2004环境管理体系标准概述(ppt 54页)

精品资料网 m.cnshu.cn

Copyright © 2004- 粤ICP备10098620号-1