精品资料网 >> 生产管理 >> 工艺技术 >> 资料信息

综合电路知识(pdf 43页)

所属分类:工艺技术

文件大小:110 KB

下载要求:10 学币或VIP

点击下载
资料简介:

1 Scope …………..... 1
2 Normative reference(s) ……............. 1
3 Term(s) and definition(s) …….......... 1
4 Symbols (and abbreviated terms)…………..... 2
5 Protocol activation of PICC Type A…………... 4
5.1 Request for answer to select ……... 6
5.2 Answer to select ……...................... 6
5.2.1 Structure of the bytes…….............. 7
5.2.2 Length byte…….............................. 7
5.2.3 Format byte…….............................. 7
5.2.4 Interface byte TA(1) ……................. 8
5.2.5 Interface byte TB(1) ……................. 8
5.2.6 Interface byte TC(1) ……................. 9
5.2.7 Historical bytes……........................ 9
5.3 Protocol and parameter selection request ……................................. 10
5.3.1 Start byte……................................ 10
5.3.2 Parameter 0……............................ 11
5.3.3 Parameter 1……............................ 11
5.4 Protocol and parameter selection response …….............................. 11
5.5 Activation frame waiting time …… 12
5.6 Error detection and recovery ……. 12
5.6.1 Handling of RATS and ATS…….... 12
5.6.2 Handling of PPS request and PPS response……....... 12
5.6.3 Handling of the CID during activation…………....... 13
6 Protocol activation of PICC Type B ………… 14
7 Half-duplex block transmission protocol …………. 15
7.1 Block format……........................... 15
7.1.1 Prologue field……......................... 15
7.1.2 Information field……..................... 18
7.1.3 Epilogue field……......................... 18
7.2 Frame waiting time ……................ 19
7.3 Frame waiting time extension …… 19
7.4 Power level indication ……............ 20
7.5 Protocol operation……................. 20
7.5.1 Multi-Activation……...................... 21
7.5.2 Chaining……........... 21
7.5.3 Block numbering rules ……........... 22
7.5.4 Block handling rules…….............. 22
7.5.5 Error detection and recovery ……. 23
8 Protocol deactivation of PICC Type A and Type B……..................... 25
8.1 Deactivation frame waiting time…………...... 25
8.2 Error detection and recovery ……. 25
Annex A (informative) Multi-Activation example…………... 26
Annex B (informative) Protocol scenarios…………... 27
B.1 Notation………… 27
B.2 Error-free operation……............... 27
B.2.1 Exchange of I-blocks……............. 27
B.2.2 Request for waiting time extension ………… 28
ISO/IEC FDIS 14443-4:2000(E)
iv © ISO/IEC 2000 – All rights reserved
B.2.3 DESELECT ……............................. 28
B.2.4 Chaining……................................. 28
B.3 Error handling……........................ 29
B.3.1 Exchange of I-blocks……............. 29
B.3.2 Request for waiting time extension ………… 30
B.3.3 DESELECT ……............................. 32
B.3.4 Chaining……............ 33
Annex C (informative) Block and frame coding overview……....................... 36
..............................

上一篇:联想手机故障判别方法(doc 12页)

下一篇:结构突变与协变理论简介(doc 17页)

汽车马达知识讲座(ppt 45页)

TAB工艺制程(PPT 90页)

超细微粒灭火剂的设计及制备工艺研究(PDF 67页)

二氧化碳气体保护焊工艺规程(PDF 20页)

旗袍制作工艺培训课件(PPT 55页)

玻璃包装材料与制品的讲解(ppt 55页)

精品资料网 m.cnshu.cn

Copyright © 2004- 粤ICP备10098620号-1