精品资料网 >> 生产管理 >> 生产运作 >> 资料信息

主要生产日程(英文)(doc 13页)

所属分类:生产运作

文件大小:1592 KB

下载要求:10 学币或VIP

点击下载
资料简介:

Master Production Schedule generates orders  for Items with Order Method (P-MPS, see Item Master). However data must be maintained in Maintain MPS Item screen. This screen is separately maintained and here user can override Economic Order Qty, Lead time, Lot Sizing Method. For user’s convenience Pull MPS Item screen is added so user can pull all MPS type items in one shot from Item Location. Item having BOM can be Make/Buy type, those which do not can only be of Buy type.

Orders of  a MPS Item will only be generated if there is net demand of item i.e. total demand(Sales Order, Warehouse transfer outgoing, Forecast, dependent demand of Item(if any) exceeds total supply(purchase, production,  warehouse transfer coming in, on hand inventory).

Following are typical steps to maintain data for MPS:
1. Maintain Items in Item Master with Order Method P.
……


..............................

上一篇:主要生产日程(英文)(ppt 21页)

下一篇:某通讯研发、生产及售后服务体系简介(doc

某通讯研发、生产及售后服务体系简介(doc 9页)

生产运作的战略决策与作业排序(ppt 186页)

咨询公司整体运作流程

跨组织协调与有序的高效运作ppt50

生产运作管理培训课程(ppt 30页)

工艺过程设计(ppt 119页)

精品资料网 m.cnshu.cn

Copyright © 2004- 粤ICP备10098620号-1