Task 15 PPAP(英文版)
所属分类:PPAP
文件大小:585 KB
下载要求:10 学币或VIP
点击下载Purpose
For the supplier to demonstrate
all design records and specification requirements are properly understood
the process has the capability to produce product that meets requirements
Application
AIAG PPAP manual defines when PPAP submission is required
New part
Correction to discrepancy in previous submission
Design or process change
Change in source of subcontracted materials or services
transfer or rearrangement of tooling & equipment
Methodology
Buyer enters PPAP submission date on purchase order
Approver determines submission level
default level 3
default level 4 for raw material
Supplier submits PPAP
PPAPALL.xls electronic submission recommended
Approver evaluates PPAP package
Level 5 at supplier site
Approver determine part submission status
Notify supplier and manufacturing of status
上一篇:Ppap生产提高
精品资料网 m.cnshu.cn
Copyright © 2004- 粤ICP备10098620号-1