精品资料网 >> 生产管理 >> 工艺技术 >> 资料信息

鞋成型工艺说明(PPT 32页)

所属分类:工艺技术

文件大小:3596 KB

下载要求:10 学币或VIP

点击下载
资料简介:

 依照鞋子結構的不同, 通常分車中底與結幫兩種成型流程:
 According to the different shoe construction, there are two kinds of
 assembly procedure ,strobel & lasting.結幫流程又分為一次流程及兩次流程或多次流程.
 For the lasting construction, there are 3kinds of procedure ,
 one time lasting & two times lasting or more than two time lasting.
 這裡僅以一次結幫流程為例,了解成型的過程:Here only show the one time
 lasting procedure for example to know the assembly procedure:
1,浸康特時注意康特角不要浸膠。
Pay more attention to the bottom of TR counter can’t be soaked.
2﹐用鑷子夾住康特放入513藥水中,只要除康特腳外其他部分有碰到膠水,
就馬上取出來.浸膠不宜過久﹐過久會使康特軟化。
Clip the counter with forceps and then put it into 513 primer . 
Don’t soak counter too long to avoid the counter from soften.
3﹐康特浸好后需放在鐵綱滴干。
Put the counter on the iron shelf after soaking.
4﹐康特擺放鐵架上涼干時不宜過久,不要超過15分鐘。
Make the counter dry not more  than 15  minutes.
5.操作員應戴上手套及口罩等環保用品.
The operator should wear the safe things of glove & respirator.
1,從裝鞋面的車架上取下鞋面,貼上流水標以便配雙作業,剪斷連線,放鞋面入流水帶上.
Take the upper from the shelf and attach pair number sticker,
then snip the thread that make one pair of upper together, at last put upper on conveyer belt.
2,剪線時不要剪到鞋面.Don’t break the upper when snip thread.3.注意鞋面要配雙.
Note: Need make the upper pair
..............................


上一篇:现代设计史培训讲义(PPT 54页)

下一篇:压塑和注塑工艺培训教材(PPT 50页)

PR-Su全部等量取代PVA的工艺探讨(doc 15页)

水泵涡壳加工工艺夹具设计论文(DOC 37页)

焊接工艺规范(PPT 42页)

吹塑工艺介绍(PPT 32页)

炼铁原理与工艺培训课程(ppt 40页)

RTM树脂传递模塑料成型工艺培训教材(PPT 43页)

精品资料网 m.cnshu.cn

Copyright © 2004- 粤ICP备10098620号-1