new gom3-supplement and exercise(ppt 18页)
所属分类:管理知识
文件大小:123 KB
下载要求:10 学币或VIP
点击下载new gom3-supplement and exercise Intorduction:
Question:
The model J Wagon is to be assembled on a conveyor belt. Five hundred wagons are required per day. Production time per day is 420 minutes, and the assembly steps and times for the wagon are given in the following Exhibit. Assignment: find the balance that minimizes the number of workstations, subject to cycle time and precedence constraints.
Question
A company is considering adding a new feature that will increase unit sales by 6 percent and product cost by 10 percent. Profit is expected to increase by 16 percent of the increased sales. Initially the product cost incurred by the company was 63 percent of the sales price. Should be the feature be added?
Let the sales be $100M.
Solution
Day 1
Problem 1
Sales increase by 6% = $100M x 6% = $6M
Benefits: Profits increase by 16% of the increased sales = $6M x 16% = $0.96M
Cost: Increase product cost by 10% = ($100M x 63%) x 10% = $6.3M
Because costs exceed benefits, the new feature should not be added.
上一篇:new gom3-quality management(ppt 27页)
精品资料网 m.cnshu.cn
Copyright © 2004- 粤ICP备10098620号-1
风险管理 应急预案 研发管理 运营管理 内部管理 商业模式 执行力 连锁经营 公司治理 工厂管理 创新管理 家族企业 效率管理 名企案例 企业理念 价值管理 特许经营 瓶颈管理 调查问卷 策划方案 领导力 团队建设 企业变革 企业文化 战略管理 竞争策略 管理知识 危机管理 成本管理 项目管理 发展战略 年度计划 决策管理 企业上市 供应商 组织设计 产品管理 采购管理 品牌管理 企业诊断 企业咨询 商务谈判 物流管理 运作管理 管理制度 行业报告 经营管理 企划方案 MBA 流程管理 目标管理 招标投标 商务礼仪 管理表格 管理技能 管理案例 管理工具 管理手册 职业经理人 商业计划书 董事与股东 可行性报告