精品资料网 >> 品质管理 >> 六西格玛管理 >> 资料信息

SixSigmaProjectReviewTemplate英文(ppt 15页)

所属分类:六西格玛管理

文件大小:226 KB

下载要求:10 学币或VIP

点击下载
资料简介:

1.  Project summary
2.  Team
3.   Leveraging
4.  Picture of part/process
5.  Product tree
6.  Process map
7.  Pareto of opportunities
8.  Plot of long & short term process capabilities
9.  Control vs. Technology plot
10.  DPU reduction by phase
11.  Six Sigma project scorecard
12.  Future plans and barriers
13.  Attachments (examples of data analysis)

 


The Business Y抯 Definition
1. Unit Cost/Entitlement: Projects to reduce hardware costs to achieve entitlement.  Represents reduction in engine and spares parts unit cost.  Incorporates reductions in Material, Labor and Overhead.
2. Unit Cost/DFSS: Product re-designs on 1) New hardware, 2) Legacy hardware which result in reduced engine and spare parts unit cost.  Incorporates reductions in Material, Labor and Overhead.
3. Turn Around Time: Reductions in Overhaul and repair cycle time.  Primarily focused on Services.  Incorporates reduct-ions in touch labor and other conversion costs.  Also includes reductions in capacity related P&E and Rotable requirements.
4. Scrap/Rework: Projects focused on reduction of Scrap and Rework in Production and Engine Services.
5. Warranty/Concession: 1) Projects focused on driving down current issues in W&C, 2) DFSS projects to reduce future W&C 3) DFSS projects focused on developing more robust design tools to improve reliability and reduce long term costs  (2-3 yrs)

 


..............................

上一篇:SixSigmaGeneralView英文(ppt 20页)

下一篇:SixSigmaStrategiesforExcellence中英文(

襄阳万千六西格玛小组督导管理制度和实施方案(ppt 97页)

摩托罗拉的6sigma质量理论(PDF 8页)

Six Sigma Overview(PDF 66)

6Sigma绿带基础知识概述(PPT 50页)

IntroductionofSixSigma(ppt 47)

六西格玛黑带项目培训课件(ppt 73页)

精品资料网 m.cnshu.cn

Copyright © 2004- 粤ICP备10098620号-1