精品资料网 >> 品质管理 >> spc统计 >> 资料信息

SPCCalculator(xls 6)

所属分类:spc统计

文件大小:90 KB

下载要求:10 学币或VIP

点击下载
资料简介:

      
 Once you have constructed the control charts, you need to interpret each chart's pattern to determine whether the process is "in control" or "out of control." 
 Below are several common indicators of being out of control, i.e. something has changed in the process being studied. Each Chart is judged separately. 
  
 Divide the control chart into equal-size zones (A, B, and C) above and below the center line as shown below. These zones are equal to 1, 2 and 3 standard deviations from the "center line" Then apply the following tests: 
 "Out of control" conditions occurs if any one of the following situations is found: 
 1  Any occurrence of a point outside of the either control limits: UCL or LCL
 2 Two out of three points in Zone A on the same side of the center line
 3 Four out of five points in Zone B or beyond on the same side of the center line
 4 Nine consecutive points on the same side of the center line
 5 Six consecutive points increasing or decreasing
 6 Fourteen consecutive points alternating up and down
 7 Fifteen consecutive points in either Zone C (above or below the center line)

..............................

上一篇:SPC7-ToolTraining(pdf 32)

下一篇:SPCTRAINING1(ppt 40)

SPC教程培训课件(ppt 147页)

建筑企业统计题库(doc 14页)

统计方法基础知识培训教材(PPT 84页)

SPC统计过程控制(PPT 37页)

统计过程管理基础知识概述(PPT 70页)

方差分析(1)(PPT 27)

精品资料网 m.cnshu.cn

Copyright © 2004- 粤ICP备10098620号-1