精品资料网 >> 财务管理 >> 财务知识 >> 资料信息

责任中心和财务管理(英文版)(ppt 69页)

所属分类:财务知识

文件大小:226 KB

下载要求:10 学币或VIP

点击下载
资料简介:

First-Level Variances:
-The first-level variance for a cost item is the difference between the actual and master budget costs.
-Variances are “favorable” if the actual costs are less than estimated costs.
-Variances are “unfavorable” if the actual costs exceeds estimated costs.
Decomposing Variances:
-What are flexible budgets?
-Flexible budgets recast cost targets in the planned or master budget to reflect the actual level of production.
-This allows comparisons of actual results  to targets based on the achieved level of production.
-What are planning variances?
-They reflect the effect of the volume change between the master budget and actual activity level achieved.
-What are flexible budget variances?
-They show the differences between the flexible budget and the actual results.
Decomposing Variances:
-What is the direct material efficiency or usage variance?
-It is actual quantity used at target or standard price less the flexible budget allowance at the planned or target price.
-Usage Variance = (AQ – SQ) × SP
-What is the direct material price variance?
-Price Variance = (AP – SP) × AQ

 

 


 


..............................

上一篇:申报表填报说明概述(doc 51页)

下一篇:国际税收知识概述(ppt 269页)

财务管理的职能(ppt 17页)

农户小额信用贷款检查方法(doc 15页)

某集团财务控制管理及财务知识分析制度(PPT 62页)

论中华工商上市公司财务指标指数(doc 14页)

如何掌握业绩管理评价(doc 49页)

财产继承权及财务知识分析(ppt 29页)

精品资料网 m.cnshu.cn

Copyright © 2004- 粤ICP备10098620号-1